The relationship between the Last Plannertextregistered System and collaborative planning practice in UK construction

Emmanuel Itodo Daniel, Emmanuel Itodo Daniel, Christine Pasquire, Christine Pasquire, Graham Dickens, Graham Dickens, Herman Glenn Ballard, Herman Glenn Ballard

Research output: Contribution to journalArticle

Original languageEnglish
Pages (from-to)407-425
Number of pages19
JournalEngineering, Construction and Architectural Management
Volume24
Issue number3
Publication statusPublished - 2017

Cite this

Daniel, E. I., Daniel, E. I., Pasquire, C., Pasquire, C., Dickens, G., Dickens, G., ... Ballard, H. G. (2017). The relationship between the Last Plannertextregistered System and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(3), 407-425.
Daniel, Emmanuel Itodo ; Daniel, Emmanuel Itodo ; Pasquire, Christine ; Pasquire, Christine ; Dickens, Graham ; Dickens, Graham ; Ballard, Herman Glenn ; Ballard, Herman Glenn. / The relationship between the Last Plannertextregistered System and collaborative planning practice in UK construction. In: Engineering, Construction and Architectural Management. 2017 ; Vol. 24, No. 3. pp. 407-425.
@article{8f418e8782914c2984c611cb7eef9b06,
title = "The relationship between the Last Plannertextregistered System and collaborative planning practice in UK construction",
author = "Daniel, {Emmanuel Itodo} and Daniel, {Emmanuel Itodo} and Christine Pasquire and Christine Pasquire and Graham Dickens and Graham Dickens and Ballard, {Herman Glenn} and Ballard, {Herman Glenn}",
year = "2017",
language = "English",
volume = "24",
pages = "407--425",
journal = "Engineering, Construction and Architectural Management",
issn = "0969-9988",
publisher = "Emerald Publishing Limited",
number = "3",

}

Daniel, EI, Daniel, EI, Pasquire, C, Pasquire, C, Dickens, G, Dickens, G, Ballard, HG & Ballard, HG 2017, 'The relationship between the Last Plannertextregistered System and collaborative planning practice in UK construction', Engineering, Construction and Architectural Management, vol. 24, no. 3, pp. 407-425.

The relationship between the Last Plannertextregistered System and collaborative planning practice in UK construction. / Daniel, Emmanuel Itodo; Daniel, Emmanuel Itodo; Pasquire, Christine; Pasquire, Christine; Dickens, Graham; Dickens, Graham; Ballard, Herman Glenn; Ballard, Herman Glenn.

In: Engineering, Construction and Architectural Management, Vol. 24, No. 3, 2017, p. 407-425.

Research output: Contribution to journalArticle

TY - JOUR

T1 - The relationship between the Last Plannertextregistered System and collaborative planning practice in UK construction

AU - Daniel, Emmanuel Itodo

AU - Daniel, Emmanuel Itodo

AU - Pasquire, Christine

AU - Pasquire, Christine

AU - Dickens, Graham

AU - Dickens, Graham

AU - Ballard, Herman Glenn

AU - Ballard, Herman Glenn

PY - 2017

Y1 - 2017

M3 - Article

VL - 24

SP - 407

EP - 425

JO - Engineering, Construction and Architectural Management

JF - Engineering, Construction and Architectural Management

SN - 0969-9988

IS - 3

ER -