The Magic of the Last Planner System for Nigerian Construction

Emmanuel Daniel, Christine Pasquire, Oko John Ameh

Research output: Contribution to journalArticle

Abstract

Extremely poor economic performance of the Nigerian construction industry suggests that non-value adding activities are prevalent, which result not only in the reduction of contractors' profit margin but economic loss for the country in general. This study analyses non-value adding activities in Nigerian construction sites. The research seeks to establish potential antidotes within the Last Planner® System (LPS) and reveal the elements of the LPS which could be abstracted into Nigerian construction to improve performance. It was found that these elements form the theoretical basis for developing a lean approach that was labelled Last Planner® thinking. The research design comprises mixed quantitative cross-sectional survey and qualitative-exploratory approaches. Registered contractors and construction professionals in academia who are based in Lagos metropolis, Nigeria, form the population for the study. The instrument for data collection was survey questionnaire and semi-structured open ended interview. Forty questionnaire and three interview responses were analysed using descriptive statistics. The study reveal various incidences and contributory factors to non-adding value activities, with long approval process been the most prevalent and the identified solution embedded in Last Planner practices. It also identified current practices that indicate Last Planner System practices. The study concludes that Last Planner thinking has the potential for minimising non-value adding activities and proposed that Last Planner thinking should be developed as a precursor framework to ensure that participants are already thinking in a way that aids the implementation of the Last Planner System. The study provides evidence that the developed framework built more confidence in the organisation for continuous improvement.
Original languageEnglish
Pages (from-to)605-616
Number of pages12
JournalProceedings for the 22th Annual Conference of the International Group for Lean Construction
DOIs
Publication statusPublished - 2014

Fingerprint

questionnaire
construction industry
metropolis
interview
descriptive statistics
research planning
performance
Nigeria
economics
profit
incidence
confidence
evidence
Values

Cite this

@article{a0364cdb52c043efab37d506a4040bfd,
title = "The Magic of the Last Planner System for Nigerian Construction",
abstract = "Extremely poor economic performance of the Nigerian construction industry suggests that non-value adding activities are prevalent, which result not only in the reduction of contractors' profit margin but economic loss for the country in general. This study analyses non-value adding activities in Nigerian construction sites. The research seeks to establish potential antidotes within the Last Planner{\circledR} System (LPS) and reveal the elements of the LPS which could be abstracted into Nigerian construction to improve performance. It was found that these elements form the theoretical basis for developing a lean approach that was labelled Last Planner{\circledR} thinking. The research design comprises mixed quantitative cross-sectional survey and qualitative-exploratory approaches. Registered contractors and construction professionals in academia who are based in Lagos metropolis, Nigeria, form the population for the study. The instrument for data collection was survey questionnaire and semi-structured open ended interview. Forty questionnaire and three interview responses were analysed using descriptive statistics. The study reveal various incidences and contributory factors to non-adding value activities, with long approval process been the most prevalent and the identified solution embedded in Last Planner practices. It also identified current practices that indicate Last Planner System practices. The study concludes that Last Planner thinking has the potential for minimising non-value adding activities and proposed that Last Planner thinking should be developed as a precursor framework to ensure that participants are already thinking in a way that aids the implementation of the Last Planner System. The study provides evidence that the developed framework built more confidence in the organisation for continuous improvement.",
author = "Emmanuel Daniel and Christine Pasquire and Ameh, {Oko John}",
year = "2014",
doi = "10.13140/2.1.1117.3761",
language = "English",
pages = "605--616",
journal = "Proceedings for the 22th Annual Conference of the International Group for Lean Construction",

}

The Magic of the Last Planner System for Nigerian Construction. / Daniel, Emmanuel; Pasquire, Christine; Ameh, Oko John.

In: Proceedings for the 22th Annual Conference of the International Group for Lean Construction, 2014, p. 605-616.

Research output: Contribution to journalArticle

TY - JOUR

T1 - The Magic of the Last Planner System for Nigerian Construction

AU - Daniel, Emmanuel

AU - Pasquire, Christine

AU - Ameh, Oko John

PY - 2014

Y1 - 2014

N2 - Extremely poor economic performance of the Nigerian construction industry suggests that non-value adding activities are prevalent, which result not only in the reduction of contractors' profit margin but economic loss for the country in general. This study analyses non-value adding activities in Nigerian construction sites. The research seeks to establish potential antidotes within the Last Planner® System (LPS) and reveal the elements of the LPS which could be abstracted into Nigerian construction to improve performance. It was found that these elements form the theoretical basis for developing a lean approach that was labelled Last Planner® thinking. The research design comprises mixed quantitative cross-sectional survey and qualitative-exploratory approaches. Registered contractors and construction professionals in academia who are based in Lagos metropolis, Nigeria, form the population for the study. The instrument for data collection was survey questionnaire and semi-structured open ended interview. Forty questionnaire and three interview responses were analysed using descriptive statistics. The study reveal various incidences and contributory factors to non-adding value activities, with long approval process been the most prevalent and the identified solution embedded in Last Planner practices. It also identified current practices that indicate Last Planner System practices. The study concludes that Last Planner thinking has the potential for minimising non-value adding activities and proposed that Last Planner thinking should be developed as a precursor framework to ensure that participants are already thinking in a way that aids the implementation of the Last Planner System. The study provides evidence that the developed framework built more confidence in the organisation for continuous improvement.

AB - Extremely poor economic performance of the Nigerian construction industry suggests that non-value adding activities are prevalent, which result not only in the reduction of contractors' profit margin but economic loss for the country in general. This study analyses non-value adding activities in Nigerian construction sites. The research seeks to establish potential antidotes within the Last Planner® System (LPS) and reveal the elements of the LPS which could be abstracted into Nigerian construction to improve performance. It was found that these elements form the theoretical basis for developing a lean approach that was labelled Last Planner® thinking. The research design comprises mixed quantitative cross-sectional survey and qualitative-exploratory approaches. Registered contractors and construction professionals in academia who are based in Lagos metropolis, Nigeria, form the population for the study. The instrument for data collection was survey questionnaire and semi-structured open ended interview. Forty questionnaire and three interview responses were analysed using descriptive statistics. The study reveal various incidences and contributory factors to non-adding value activities, with long approval process been the most prevalent and the identified solution embedded in Last Planner practices. It also identified current practices that indicate Last Planner System practices. The study concludes that Last Planner thinking has the potential for minimising non-value adding activities and proposed that Last Planner thinking should be developed as a precursor framework to ensure that participants are already thinking in a way that aids the implementation of the Last Planner System. The study provides evidence that the developed framework built more confidence in the organisation for continuous improvement.

U2 - 10.13140/2.1.1117.3761

DO - 10.13140/2.1.1117.3761

M3 - Article

SP - 605

EP - 616

JO - Proceedings for the 22th Annual Conference of the International Group for Lean Construction

JF - Proceedings for the 22th Annual Conference of the International Group for Lean Construction

ER -